We have assembled an expert team, including our principles – who are all experienced and fully qualified electricians. At Mellon Inc., we are constantly engaged in upgrading our training and technical abilities in order to ensure we are at the forefront of advances in our industry.

Our project list is varied and extensive, and while we are proud of all of our work, these are some of the key projects Mellon has completed recently:


BP logoBP AMOCO – 1982 - Current
With a relationship that has lasted over 29 years, Mellon has worked with BP as the electrical maintenance contractor as well as on capital projects at the natural gas liquids fractionation plant in Sarnia. Work includes high voltage, low voltage and fiber optics.

 


compass minerals logoCOMPASS MINERALS / SIFTO CANADA – 2007 - Current

The world’s largest salt mine located in Goderich, ON has had its electrical maintenance and project work supported by Mellon since 2007.

 


BLUE WATER BRIDGE CANADA – 2009 - 2011

The Canadian Plaza Improvements Project includes the construction of the new state of the art 5 floor, LEEDs certified, Canada Border Agency building with all the related security, surveillance, building automation and associated infrastructure.

 


FIRST SOLAR - 2010

The First Solar Sarnia 60MW solar farm was the largest in the world at the time of the construction and was completed by Mellon as the primary contractor in the span of just 4 months with a crew of over 450.

 


ESSO/IMPERIAL OIL - 2009

Completion of the electrical and instrumentation portion of the tail gas recovery unit (TGCU) at the IOL Sarnia refinery included transformers, switchgear, lighting and electric heat tracing as part of this project which spanned over 14 months.

 


ST CLAIR ENERGY CENTER – 2008/2009

Completion of all electric heat tracing of the 577MW natural gas-fired combined cycle electricity generating facility in St Clair Town ship. The installation included all power distribution, control panels as well as approx 29,000ft of insulated tracer cable.

 


GREENFIELD ENERGY CENTRE – 2007-2008

Mellon completed the underground duct system and grounding grid, fiber optics as well as electrical and instrumentation work on the combustion turbine generators (CTGs), heat recovery steam generators (HRSGs) and battery room at the 1,005MW natural gas-fired combined cycle electricity generating facility in Courtright, ON.

 